Prince of Wales Bridge (POWB) N48 Rapid Access Train (RAT) Station | QuikDeck® & Scaffolding Access Solution

QuikDeck® Suspended Access Solution

Brand Access Solutions delivered a safe and efficient suspended access solution for maintenance works on the Prince of Wales Bridge, connecting England and Wales.

Manchester Airport Terminal 2 Check-In

Scope

The project involved: 

  • QuikDeck® suspended platform to provide high-capacity access with minimal suspension points 
  • Supplementary scaffolding tied into the QuikDeck system 
  • Full in-house engineering and design services to ensure fast, safe, and efficient installation 
  • Turnkey solution including assembly and hoisting for blasting and painting works 

 

Challenge

  • Limited Suspension Points: Traditional scaffolding or other suspended systems require multiple anchor points, which can obstruct blasting, painting, and touch-up works. QuikDeck’s design reduced the number of suspension points while maintaining full platform capacity. 
  • Safety and Environmental Control: Work had to be carried out above a tarmac storage area while preventing debris contamination. The platform also needed to allow safe access underneath for other operations. 
  • Rapid Installation and Reduced Manual Handling:  The platform was hoisted into the air to maximise efficiency and minimize labour intensity. 
  • Cantilever Access: The platform had to extend past the RAT station edge to allow erection of secondary scaffolding and provide two-level access. 

Solution

  • Pre-Assembled QuikDeck Platform: The starter platform was built on the ground fully loaded with materials, then hoisted into position. This method reduced manual handling and accelerated the installation process. 
  • Fewer Suspension Points: Chain-suspended QuikDeck allowed anchor points to be easily relocated, facilitating touch-ups without disassembly. 
  • Cantilevered Extension: Enabled erection of secondary scaffolding for two-level access to the RAT station, serving as the primary entry point. 
  • Sealed Working Surface: Ensured debris and grit were contained, protecting the surrounding environment and allowing work to continue safely underneath the platform. 
  • Supplementary Scaffolding: Additional scaffolding integrated seamlessly with the QuikDeck system for enhanced access and operational flexibility. 

Result

  • Delivered a safe, adaptable access solution for maintenance on a live infrastructure bridge. 
  • Achieved a rapid installation with reduced manual handling thanks to pre-loading the platform. 
  • Maintained environmental safety with a fully sealed deck, preventing contamination. 
  • Provided flexible access for multiple trades simultaneously, improving productivity. 
  • Reinforced Brand Access Solutions’ reputation as a trusted provider of high-performance suspended access solutions for complex UK infrastructure projects.

To find out more about Quikdeck, take a look at our QuikDeck Brochure here