Co-op Live Arena | Hybrid Access

QuikDeck® Suspended Access System | Mechanical Access

Europe’s largest QuikDeck® installation

Scope

Our Manchester branch successfully delivered the largest QuikDeck® suspended platform installation in Europe at the new Co-op Live Arena. This complex capital project in the Commercial, Arenas & Stadiums sector required a fully integrated access solution to support multiple trades during construction. 

For more information on QuikDeck® view our Brochure here

Challenge

This landmark project presented several technical and logistical challenges: 

  • Limited Roof Truss Load Capacity:  Roof trusses had strict load limits, making traditional decking systems unsuitable.
  • Structural Deflection During Roof Concrete Pour: The platform needed to accommodate truss movement during the concrete pour without affecting structural integrity.
  • Simultaneous Work Above and Below: Tight programme requirements meant trades had to work safely on and under the platform at the same time
  • Complex Multi-Level Access Needs: The system had to provide safe access for M&E installation, event rigging, painting, and curtain partitioning. 

Solution

Our early involvement meant we could collaborate closely with the client to design a bespoke access strategy. 

Key elements included: 

  • Using QuikDeck® with lightweight composite board decking panels, reducing dead weight by half compared to plywood while maintaining full load capacity. 
  • Chain-suspended platform design to distribute load evenly and suit truss capacity. 
  • Flexible system capable of managing roof deflection without impacting safety or performance. 
  • Fully sealed platform enabling uninterrupted work underneath. 
  • Integrated delivery of QuikDeck®, scaffolding, and hoists for a coordinated, efficient solution. 
  • BIM clash detection to identify and resolve potential conflicts before they occurred. 
  • Local branch proximity (10 minutes from site) allowed rapid response and additional scaffolding works. 

Result

  • Europe’s largest QuikDeck® installation delivered safely, on schedule, and to an exceptionally high standard. 
  • Multi-trade access achieved above and below the platform, maximising programme efficiency. 
  • Structural challenges overcome without delays or incidents. 

This high-profile project demonstrates our ability to deliver innovative, large-scale access solutions for complex commercial builds, combining engineering expertise, local branch support, and multiple coordinated services. 

 