Thames Tideway Tunnel, London | Suspended Scaffolding & Shaft Access

Engineered suspended scaffolding and staircase access for a 54-metre-deep tunnel shaft

The construction of London's Thames Tideway Tunnel required a specialised access solution for a 54-metre-deep shaft on the project's central section. Brand Access Solutions developed a suspended CUPLOK® scaffolding and staircase system, progressively installed as excavation advanced. Heavy-duty support brackets, detailed structural calculations and regular inspections formed part of the engineered access solution.

 

Scope

The Thames Tideway Tunnel, also known as London's Super Sewer, is a major underground infrastructure project designed to improve the capital's wastewater system.

Brand Access Solutions, formerly Lyndon SGB, was appointed by the FLO joint venture, comprising Ferrovial Agroman and Laing O'Rourke, to provide specialist scaffolding access for works on the central section of the tunnel project.

The scope included the design, supply and installation of a 54-metre suspended staircase access system within a deep excavation shaft. The structure combined CUPLOK® system scaffolding with MkII Soldier components to form heavy-duty support brackets.

Work commenced in October 2017, with access installations and associated services provided as part of the project's continuous construction operations.

Challenge

Providing access within a 54-metre-deep shaft presented significant engineering and installation challenges. As excavation progressed, the access structure had to be extended downwards while maintaining a secure connection to the surrounding shaft walls.

Unlike conventional ground-supported scaffolding, the suspended staircase required a support arrangement capable of transferring loads into the shaft structure at defined intervals.

Heavy-duty gallows brackets were therefore required at eight-metre intervals, mechanically secured to the shaft wall using chemical anchors.

The progressive excavation also meant that the scaffolding could not be installed as a complete structure in a single operation. Instead, it had to be constructed and extended lift by lift as the shaft deepened.

The temporary works design required detailed structural calculations and independent checking to meet the engineering and inspection requirements of the underground construction environment.

Performance

Brand Access Solutions developed the suspended staircase and supporting scaffold structure in-house, using CUPLOK® system scaffolding and MkII Soldier components.

The heavy-duty gallows brackets provided support at eight-metre intervals, while the lift-by-lift installation method allowed the staircase access to be progressively extended as excavation continued.

The engineering package included detailed structural calculations, CAT certification and a Category 2 design check prior to installation.

Completed sections of the suspended staircase were handed over progressively and subjected to Schedule 7 statutory inspections. Brand Access Solutions also provided weekly site inspections within the tunnels.

The resulting 54-metre suspended staircase arrangement provided the required access within the excavation shaft, demonstrating the application of engineered scaffolding and staged installation methods to deep underground infrastructure construction.

Let's do something great on your next project.

Contact Us

Important Note.

Lyndon SGB rebranded to Brand Access Solutions on February 4, 2025.
Projects were delivered at the time under the trading names of: Lyndon SGB, SGB, Lyndon Scaffolding or Taylor’s Hoists.