Double-deck mast climbing work platforms for a 44-storey modular high-rise development
The construction of two residential towers at George Street in Croydon required a high-capacity access solution for modular installation and façade works at heights of up to 140 metres. Brand Access Solutions supplied 20 double-deck Mastclimbers™ with anti-collision devices, enabling different construction activities to be carried out at separate platform levels.
Scope
The George Street development in central Croydon is one of the UK's largest modular construction projects, comprising two residential towers of 44 and 38 storeys, measuring approximately 140 and 130 metres respectively. The development involved the assembly of 1,526 prefabricated modules to create 546 new homes.
Brand Access Solutions, formerly Lyndon SGB, was appointed by main contractor Tide Construction to provide mechanical access and supplementary scaffolding for the project, with a contract value of approximately £1 million. The access package included 20 double-deck Mastclimbers™ with platform lengths ranging from 13 to 23 metres. Each unit featured a 900 mm adjustable front extension to accommodate the varying geometry of the glazed terracotta façade.
The contract covered 57 weeks, with two Brand Access Solutions teams in continuous attendance.

Challenge
The height and scale of the modular development presented significant access challenges. The construction sequence required prefabricated building modules to be lifted into position by crane and subsequently secured, while external finishing and cladding works were carried out on the façades. These activities required access at different working levels without obstructing the modular installation process. Operating multiple mast climbing work platforms at considerable height also required careful coordination. Anti-collision devices were incorporated to support the safe operation of the platforms.
The façades presented an additional challenge. Their varying geometry and glazed terracotta finish required adaptable platform configurations to provide access to different façade sections.
At street level, public protection measures were also necessary along the George Street elevation.
Performance
Brand Access Solutions developed an in-house engineered mechanical access solution using 20 double-deck Mastclimbers™. The upper platforms provided access for securing prefabricated modules after crane installation, while the lower platforms were used for external finishing and cladding works. This arrangement enabled the access system to accommodate two distinct stages of the modular construction process. Anti-collision devices supported the coordinated operation of the mast climbing platforms, while the 900 mm adjustable front extensions allowed access to the varying geometry of the glazed terracotta façade. A scaffold support gantry was also installed at the lower level along the George Street elevation to provide public protection.
With two teams in continuous attendance throughout the 57-week contract, Brand Access Solutions provided ongoing support for the mechanical access installation.
The project demonstrates the application of engineered double-deck mast climbing work platforms to large-scale modular high-rise construction, combining access for module installation, façade finishing and public protection within a coordinated access package.


Let's do something great on your next project.
Contact Us
Important Note.
Lyndon SGB rebranded to Brand Access Solutions on February 4, 2025.
Projects were delivered at the time under the trading names of: Lyndon SGB, SGB, Lyndon Scaffolding or Taylor’s Hoists.