Altus House, Leeds | Mastclimbers™

Brand Access Solutions Mastclimbers™ Leeds City Centre Altus House Project For RG Group.

Scope

Brand Access Solutions Mastclimbers™ have been busy in action in Leeds City Centre working skilled and safe vertical access on Altus House – a 111-metre, 37 floor, new-build student accommodation block for the RG Group.

Challenge

Working to the main contractor’s exacting schedule, this ultra-modern construction project will take over a year to complete (with COVID-secure work on-going through the pandemic) – and all with just two Brand Access Solutions Mast Climbing Work Platforms (Mastclimbers™) operatives.

Speaking about the Leeds project, Brand Access Solutions Contracts Manager for the Mastclimbers™ team, John Bailey, said: “This was a technical project from start to finish, but with the assistance from our Leeds scaffold division, Brian Harris and his team, Site Supervisor for the project Darren Emmison, and also our design engineer, Ian Cook for his support throughout, plus the install team’s work ethic the project has been a difficult one but a rewarding success.”

Brand Access Solutions MD, added: “The nationwide capability of our Mastclimbers™ operation – based out of dedicated operational centres in Manchester and Glasgow – is second to none. They are working on some of the country’s tallest modular structures and interesting construction projects and the safety and quality of their work is fantastic, as is their ability to work alongside our scaffolding and hoist operations.”

Let's do something great on your next project.

Contact Us

Important Note.

Lyndon SGB rebranded to Brand Access Solutions on February 4, 2025.
Projects were delivered at the time under the trading names of: Lyndon SGB, SGB, Lyndon Scaffolding or Taylor’s Hoists.