Trent River Bridge, Nottingham | QuikDeck® Suspended Access

The Trent River Bridge was provided with an access solution by BrandSafway. To perform refurbishment work on the facades and underside of the bridge we provided an access solution by combining QuikDeck® and CUPLOK®.

Trent River Bridge

Scope

There were only 45 tie-ins to the structure for suspension on this 900m2 platform, which is a reduction of 50% when compared to other
systems – without reducing the workload. The suspension chains used for suspending the platform are also extremely flexible and are easily moved to allow access to points which are usually left as touch-up work at the end of a project.

Challenge

Designed for access challenges in the air, around curves, in tight corners, and underneath structures, BrandSafway’s proprietary and patented QuikDeck® Suspended Access System improves productivity, reduces costs, saves time and, most importantly, increases safety. A factory floor in the air, QuikDeck allows multiple craftspeople to easily and efficiently work side by side and use heavy equipment.

See our 2-page project report here

Let's do something great on your next project.

Contact Us

Important Note.

Lyndon SGB rebranded to Brand Access Solutions on February 4, 2025.
Projects were delivered at the time under the trading names of: Lyndon SGB, SGB, Lyndon Scaffolding or Taylor’s Hoists.